Menu
Menu
Your Cart
Ceresit Ewi Systems
4eco
Quality Metal Roofing
Torch-on Roofing Felt

Off cuts, padding, pads - mix

Off cuts, padding, pads - mix
Off cuts, padding, pads - mix
  • Product Code: U3090
  • Delivery Time: 1 - 2 days
  • Brand: Seqo
  • Model and Size: mix
  • Weight: 29.00kg

Off cuts, padding, pads - mix

Weight: 29kg

The set includes pads in lengths less than 30 cm in various sizes, including:

  • 72 × 11 mm
  • 80 × 20 mm
  • 92 × 20 mm
  • 85 × 13 mm
  • 140 × 25 mm

The kit can be modified. When placing an order, please specify what thicknesses or lengths of the washers should prevail, if there is no information, the content of the package is selected randomly.

The pads are perfect for installing doors, windows, floors and terraces. They can also be cut easily and are very durable.

Brand: Seqo Model and Size: Foundation Support
Delivery Time: 1 - 2 days
Foundation system - does not require concrete, which reduces the costs and time of installing the terrace, is environmentally friendly. The foundation system includes: Foundation bolt Foundation bracket..
Brand: Seqo Model and Size: PL-150H12
Delivery Time: 1 - 2 days More options available
SEQO PREMIUM boards are products of the highest quality. They are the result of the use of co-extrusion. Their advantage over other composites is high resistance, resistance to mechanical damage and anti-slip properties. The boards do not require impregnation. The specially selected components of th..
Brand: Seqo Model and Size: Stone
Delivery Time: 1 - 2 days
Quick-mounting stone tiles Advantages of composite tiles: Resistant to weather conditions from -40 ° C to 60 ° C Simple, innovative plug-in system A stable base Quick assembly without tools Different laying patterns possible 11 tiles / 1 m² Drainage made of durable polypropylene Does not hol..
Brand: Seqo Model and Size: SP01
Delivery Time: 1 - 2 days More options available
Brand: Seqo Model and Size: SL-45H11
Delivery Time: 1 - 2 days
Model: SL-45H11..
Brand: Seqo Model and Size: M8x35
Delivery Time: 1 - 2 days
Post Base Screw Model M8x35. High quality post base screws...